Give your wayfinding designer the latest floor plans, a list of destinations, the routes people take to reach them and the name of the person who approves sign wording. These four inputs help a signage contractor turn the brief into a sign location plan and a schedule that the project team can price and review.
Where will visitors need directions?
Walk one journey on the plan. For example, imagine a first-time hotel guest arriving from basement parking for a ballroom event. Mark where the guest chooses a lift lobby, selects a floor and turns along the corridor. Each choice suggests a directional message. At the ballroom door, the guest needs confirmation that they have arrived.
What belongs in the sign schedule?
Give each proposed sign an ID and mark that ID on the floor plan. Record the destination wording, arrow direction, languages, quantity, mounting surface and drawing revision. For a suspended sign, record what visitors approaching from each side should read. A single arrow copied onto both faces can send one group the wrong way.
What should the project team approve before fabrication?
Have the operator confirm destination names and the architect confirm locations against the current layout. Check sightlines, mounting details and finishes with the installation team. When a room name changes, revise the directory and every sign that points to it before releasing shop drawings.
For a project in Malaysia, BrandMug can review your brief, design the wayfinding package and fabricate the approved signs. Explore our wayfinding service or send the floor plans and project brief.